How it works
Holes, typically one to two inches across, are drilled through the slab. A cement-based slurry, a mix of soil or sand, cement and water, is pumped underneath under pressure. It fills the voids first, then lifts the slab as more is pumped. The lift is visible as it happens, so the operator can stop exactly at level. The holes are patched with matching concrete.
Strengths
- Strong: the slurry hardens into a dense, solid base under the slab
- Fills large voids economically
- Immediate feedback: the slab rises as you watch
- Lower material cost than foam on big voids
- Long track record: used for decades on homes and highways
Limits
- Larger holes than foam
- The slurry is heavy, which matters over very weak soil
- Needs some cure time before heavy use
Foam or slabjacking?
Both work. Foam wins on hole size and speed; slabjacking wins on strength and cost for large voids. A good specialist will recommend the one that suits your slab and soil.